PERENCANAAN KEBUTUHAN SUMBER DAYA PEKERJAAN REPARASI KAPAL SPOB 585 GT = MANPOWER RESOURCE PLANNING FOR REPAIRING TANKER SHIP SPOB 585 GT


Aldonni, Aldonni (2024) PERENCANAAN KEBUTUHAN SUMBER DAYA PEKERJAAN REPARASI KAPAL SPOB 585 GT = MANPOWER RESOURCE PLANNING FOR REPAIRING TANKER SHIP SPOB 585 GT. Skripsi thesis, Universitas Hasanuddin.

[thumbnail of Cover]
Preview
Image (Cover)
D031181011_skripsi_12-07-2024 cover1.png

Download (157kB) | Preview
[thumbnail of Bab 1-2] Text (Bab 1-2)
D031181011_skripsi_12-07-2024 1-2(FILEminimizer).pdf

Download (847kB)
[thumbnail of Dapus] Text (Dapus)
D031181011_skripsi_12-07-2024 dp(FILEminimizer).pdf

Download (435kB)
[thumbnail of Full Text] Text (Full Text)
D031181011_skripsi_12-07-2024(FILEminimizer).pdf
Restricted to Repository staff only until 25 November 2026.

Download (1MB)

Abstract (Abstrak)

ALDONNI. Perencanaan Kebutuhan Sumber Daya Pekerjaan Reparasi Kapal Tanker SPOB 585 GT (dibimbing oleh Moh. Rizal Firmansyah dan Syamsul Asri).
Pelaksanaan proyek reparasi kapal sering menemui berbagai kendala dalam mengoptimalkan waktu, biaya serta mutu pelaksanaan. Proyek pada umumnya memiliki batas waktu (deadline). Proyek merupakan sesuatu yang dinamis, sehingga pelaksana harus tanggap terhadap perubahan situasi dan kondisi pada proyek, Untuk memperoleh kebutuhan sumber daya yang tepat, maka dilakukan identifikasi tenaga kerja, material, dan peralatan terhadap setiap item pekerjaan serta membuat penjadwalan dan analisa biaya proyek pada aplikasi Microsoft project. Berdasarkan hasil penelitian diperoleh kebutuhan tenaga kerja sebanyak 40 orang ; kebutuhan material : solar 692 liter, pasir 23593 kg, air tawar 8 ton, 30 zinc anoda, 30 liter cat bituminus, 1 liter sirlak, 99 liter thinner, 50 kg kawat las, 89,32 kg oksigen, 19,81 kg gas lpg, 89, 32 liter cat primer, 87 liter cat anti korosi, 119 liter cat anti fouling, 9 liter cat top, 3.033,09 kg plat baja, besi as ukuran 1,5 inc 1 meter, pipa seamles 1 meter, kampas rem 1 buah, pipa 2 inch 2000 mm 4 meter, mur baut 70 buah ; kebutuhan peralatan pada pekerjaan reparasi kapal SPOB 858 GT yaitu ; 1 kapal tunda, 8 buah air bag, 1 buldozer, 1 excavator, 1 mobil crane, 6 buah tongkat sekrap, 1 set blander set, 1 set wrench set, 1 buah water jet machine, 2 buah compresor 1 set blasting machine, 1 set coating spray machine, 2 buah kuas rol, 1 buah kuas biasa, 2 buah welding machine set, 1 buah sapu, 4 set rantai dan katrol, 1 set scafolding, 1 buah feeler gauge, 1 buah sikat besi, 1 set gurinda, 1 buah stan balancing, 1 buah mesin bubut, 1 buah palu, 1 buah obeng tes pen, 4 buah ember, 2 buah kop. Berdasarkan kebutuhan sumber daya tersebut maka biaya yang dibutuhkan dalam proyek reparasi kapal tanker SPOB 585 GT adalah Rp321.692.007 (Tiga Ratus Dua Puluh Satu Juta Enam Ratus Sembilan Puluh Dua ribu Tujuh Rupiah).

Keywords : Kapal tanker, Reparasi, Sumber daya

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Tanker ship, Repair, Resources.
Subjects: T Technology > T Technology (General)
Divisions (Program Studi): Fakultas Teknik > Teknik Perkapalan
Depositing User: S.Sos Rasman -
Date Deposited: 05 Dec 2024 01:27
Last Modified: 05 Dec 2024 01:27
URI: http://repository.unhas.ac.id:443/id/eprint/39921

Actions (login required)

View Item
View Item