APPLICATION OF THE FUZZY MAMDANI TO PREDICT THE AMOUNT OF MARBLE PRODUCTION AT PT WUTAMA TRI MAKMUR, SOUTH SULAWESI PROVINCE = APPLICATION OF THE FUZZY MAMDANI TO PREDICT THE AMOUNT OF MARBLE PRODUCTION AT PT WUTAMA TRI MAKMUR, SOUTH SULAWESI PROVINCE


IDRIS, MUHRAM SULA (2024) APPLICATION OF THE FUZZY MAMDANI TO PREDICT THE AMOUNT OF MARBLE PRODUCTION AT PT WUTAMA TRI MAKMUR, SOUTH SULAWESI PROVINCE = APPLICATION OF THE FUZZY MAMDANI TO PREDICT THE AMOUNT OF MARBLE PRODUCTION AT PT WUTAMA TRI MAKMUR, SOUTH SULAWESI PROVINCE. Thesis thesis, Universitas Hasanuddin.

[thumbnail of Cover]
Preview
Image (Cover)
D111171503_skripsi_18-07-2024 cover1.png

Download (232kB) | Preview
[thumbnail of Bab 1-2] Text (Bab 1-2)
D111171503_skripsi_18-07-2024 1-2(FILEminimizer).pdf

Download (661kB)
[thumbnail of Dapus] Text (Dapus)
D111171503_skripsi_18-07-2024 dp(FILEminimizer).pdf

Download (798kB)
[thumbnail of Full Text] Text (Full Text)
D111171503_skripsi_18-07-2024(FILEminimizer).pdf
Restricted to Repository staff only until 14 May 2027.

Download (1MB)

Abstract (Abstrak)

Marble can be used in homes for furniture, building components such as floors, tables, bathrooms, windows. Apart from that, marble can also be used as raw material for making trophies, statues, inscriptions, name plates, vandels, etc. Based on marble mining data by PT. Wutama Tri Makmur from 2015 - 2021 experienced excess production, causing the stockpile to be full and unable to accommodate any more marble. Using this research, marble production can be predicted for more efficient mining so as not to exceed stockpile capacity. This research applies the Fuzzy Mamdani method which is calculated using the Python programming language. application of the Mamdani fuzzy method to predict the amount of marble production through several stages, namely fuzzification, implication, rule composition and defuzzification. After several results have been predicted, the accuracy of the application of the fuzzy Mamdani method is then calculated to determine the percentage of error in the calculation of the fuzzy Mamdani method using MAPE. Based on the MAPE results, the calculation error using the fuzzy mamdani method is 11.1% and the calculation accuracy of the fuzzy mamdani method is 88.9%.

Keyword : Supply, Demand, Production, Fuzzy Mamdani, Python, MAPE.

Item Type: Thesis (Thesis)
Uncontrolled Keywords: Supply, Demand, Production, Fuzzy Mamdani, Python, MAPE.
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions (Program Studi): Fakultas Teknik > Teknik Pertambangan
Depositing User: Rasman
Date Deposited: 09 Jul 2025 02:41
Last Modified: 09 Jul 2025 02:41
URI: http://repository.unhas.ac.id:443/id/eprint/46147

Actions (login required)

View Item
View Item