Muhaidir, Dedi (2023) PENGARUH PENERAPAN ENTERPRISE RESOURCE PLANNING (ERP) PADA KINERJA SUPPLY CHAIN MANAGEMENT PROYEK PEMBANGKIT LISTRIK TENAGA AIR PT. POSO ENERGI. Thesis thesis, Universitas Hasanuddin.
Text
A012191006_tesis_16-08-2023 bab 1-2.pdf
Download (1MB)
A012191006_tesis_16-08-2023 bab 1-2.pdf
Download (1MB)
Preview
A012191006_tesis_16-08-2023 caver1.jpg
Download (296kB) | Preview
Text
A012191006_tesis_16-08-2023 dp.pdf
Download (291kB)
A012191006_tesis_16-08-2023 dp.pdf
Download (291kB)
Text
A012191006_tesis_16-08-2023.pdf
Restricted to Repository staff only until 1 January 2026.
Download (2MB)
A012191006_tesis_16-08-2023.pdf
Restricted to Repository staff only until 1 January 2026.
Download (2MB)
Abstract (Abstrak)
penelitin ini bertujuan mengtahui pengaruh penerapan Enterprise resource planning(ERP) terhadadap kinerja supply chain managemen pembangkit listrik tenaga air PT poso nergy. penelitian ini menggunakan mix-methode kuantitatif dan kualitatif
Item Type: | Thesis (Thesis) |
---|---|
Subjects: | H Social Sciences > HB Economic Theory |
Divisions (Program Studi): | Fakultas Ekonomi > Manajemen |
Depositing User: | Kamaluddin |
Date Deposited: | 21 Nov 2023 05:53 |
Last Modified: | 21 Nov 2023 05:53 |
URI: | http://repository.unhas.ac.id:443/id/eprint/28420 |