Studi Dampak Pandemi Covid - 19 Terhadap Kinerja Proyek Jalan Di Provinsi Sulawesi Selatan


Hasrisal, Hasrisal (2023) Studi Dampak Pandemi Covid - 19 Terhadap Kinerja Proyek Jalan Di Provinsi Sulawesi Selatan. Skripsi thesis, Universitas Hasanuddin.

[thumbnail of D012191023_tesis_31-10-2022 cover1.png]
Preview
Image
D012191023_tesis_31-10-2022 cover1.png

Download (320kB) | Preview
[thumbnail of D012191023_tesis_31-10-2022 1-2.pdf] Text
D012191023_tesis_31-10-2022 1-2.pdf

Download (4MB)
[thumbnail of D012191023_tesis_31-10-2022 dp.pdf] Text
D012191023_tesis_31-10-2022 dp.pdf

Download (9MB)
[thumbnail of D012191023_tesis_31-10-2022.pdf] Text
D012191023_tesis_31-10-2022.pdf
Restricted to Repository staff only until 1 January 2025.

Download (19MB)

Abstract (Abstrak)

STUDY OF THE PANDEMI IMPACT OF COVID-19 ON ROAD PROJECT PERFORMANCE IN SOUTH SULAWESI PROVINCE

Abstrack
The road is a means of circulation space which is made to facilitate transportation by land. Roads have existed since ancient human times and were used to move places and be passed to transport life's equipment, in human development only know roads made of soil that can only be passed on foot or using livestock such as horses, cows or cattle. buffalo. Silvia Sukirman (1994) states that roads are paths above the earth's surface which are intentionally made by humans with various shapes, sizes and constructions made so that they can be used to channel traffic of people, animals and vehicles that transport goods from the place of departure to the place of departure. destination quickly and easily. The impact of the spread of Covid-19 has resulted in certain conditions so that efforts to overcome them need to be carried out, one of which is through large-scale social restrictions (PSBB). Based on these considerations, President Joko Widodo has issued Government Regulation (PP) Number 21 of 2020 concerning Large-Scale Social Restrictions in the Context of Accelerating the handling of Covid-19 which was signed on March 31, 2020.
Based on the description and analysis of the Covid-19 Pandemic Impact Study on Road Project Performance in South Sulawesi Province, as many as 10 projects in the South Sulawesi province as a sample of projects that were during the Covid-19 pandemic, the performance was measured from the time during the COVID-19 pandemic and after the Covid-19 pandemic with worker productivity and the distance between workers in the field, the level of productivity in projects during the Covid-19 pandemic was 1,284 m3, the distance between workers was 0.894 m, project performance as measured by cost performance during the covid-19 pandemic and after the Covid-19 pandemic - 19 with the BCWSN method until week 11 the realization of the work was 45.72% the cost was Rp. 34,606,561.52. Projects after the Covid-19 pandemic realized 58.61% of work at a cost of Rp. 43,100,392,05, Project performance as measured by work safety performance during the COVID-19 pandemic and the post-Covid-19 pandemic, distributing questionnaires in letter Number: 02 / IN / M / 2020 issued by PUPR with a high index level, namely Provision of Health Facilities in the Field of 4.635 standard deviation of 0.593. the post-Covid-19 pandemic with the highest index level, namely the Provision of Health Facilities in the Field of 4,657 with a standard deviation of 0.522

Item Type: Thesis (Skripsi)
Subjects: T Technology > T Technology (General)
Divisions (Program Studi): Fakultas Teknik > Teknik Sipil
Depositing User: Nasyir Nompo
Date Deposited: 09 Aug 2023 03:20
Last Modified: 09 Aug 2023 03:20
URI: http://repository.unhas.ac.id:443/id/eprint/27390

Actions (login required)

View Item
View Item